1. Heads
A. Positioned 82″–96″ from floor.
B. Spray pattern will have a minimum diameter of 20″ at 60″ above the floor.
C. Flow Rate=20 gallons (75.71 l) per minute (GPM) of flushing fluid at a velocity low enough to be non-injurious to the user.
D. The center of the spray pattern shall be located at least 16 inches (40.64 cm) from any obstruction.
2. Valves
A. Activate in 1 second or less.
B. Stay-open valve (no use of hands).
C. Valve remains on until the user shuts it off.
3. Installation
A. Shower shall be located in an area that requires no more than 10 seconds to reach.
B. Shower location shall be in a well-lit area and identified with a sign.
C. The area around the shower shall be painted yellow to remind employees to keep the area clear.
4. Maintenance and Training
A. Plumbed showers will be activated weekly to verify correct operation.
B. All employees who might be exposed to a chemical splash shall be trained in the use of the equipment.
C. All showers shall be inspected monthly to make sure they meet with ANSI Z358.1 requirements.